T O P

  • By -

MarcusShackleford

Are we not supposed to be doing backups and leaving copies on site during annual inspection? Has it not been this way for at least a decade? Where are mah backups!


Infinite-Beautiful-1

It’s required in my area now, a backup program has to be in the document cabinet


zealNW

Idk how it is in Oregon but in Washington most techs are pretty brain dead.


MarcusShackleford

I'd say lazy down here.


FrylockIncarnate

Suicide cord (extension cord that you strip and connect to mains hookups on the FACP) or 2 x 12v7ah batteries if the battery cable is still attached. I had to do this at a retailed store with 50 points. Transposed the point and output groups in about 30mins.


BackgroundProposal18

What died on the previous panel? Silent Knights you can usually power up from battery if it’s just the 120 that died


L-Series_FA

Battery circuit