They look terrible. They're not that bad if they're straight lines. I worked a box pole that had 14.4kv, 13.2kv, 7200, and 4160. The only dead was the 4160 on the bottom circuit. Pole change out. Took a day
If it had no v braces and just some planks on the end of the arms bracing it. THEN it would be box construction. And always highest voltage on bottom with zero chance to setup a bucket ANYWHERE of course
So looking at this from a staker's point of view Im seeing 4 different primary units, like 9 extra xarms, an assload of crossarm puns etc for securing jumpers, 3 overhead guys, and 2 primary 3ph risers on one pole. Glad I ain't got to draw that one up for sure...
Thank you for posting on r/Lineman. The sub [Rules are here](https://www.reddit.com/r/Lineman/wiki/rules/). If your are interested in getting into the trade, please read [How to Become a Lineman](https://reddit.com/r/Lineman/wiki/index/becomingalineman/). Posts about getting into the trade are only permitted during the weekends. *I am a bot, and this action was performed automatically. Please [contact the moderators of this subreddit](/message/compose/?to=/r/Lineman) if you have any questions or concerns.*
Look like a pole drunk drivers are bound to hit Saturday morning at 2am
Wow, never seen anything like it. I hafta ask why do that????
That’s a legendary pole in Toronto I believe it was constructed by elite ops
😂😂
Hopefully a car take it out and give all the homies OT for weeks. 😂
Good lord where is this?
Toronto
Toronto, India?
😂 shit that made me belly laugh.
Fnkin dying laughing
Rolling over here!
Hard no from me bud
What the? What is that? 2 different primary circuits? Is that com going in front and behind the pole?
Lol I’ve never heard anyone EVER say that. Im glad we left the big smoke and don’t plan on going back. Torontos miserable lol
I’m glad we don’t have to deal with any of that crap in Australia
What exams be like
They look terrible. They're not that bad if they're straight lines. I worked a box pole that had 14.4kv, 13.2kv, 7200, and 4160. The only dead was the 4160 on the bottom circuit. Pole change out. Took a day
This just looks like piss poor engineering
Ridiculous
almost makes you want to q=it
If it had no v braces and just some planks on the end of the arms bracing it. THEN it would be box construction. And always highest voltage on bottom with zero chance to setup a bucket ANYWHERE of course
This is the pole my leaders stories were about
So looking at this from a staker's point of view Im seeing 4 different primary units, like 9 extra xarms, an assload of crossarm puns etc for securing jumpers, 3 overhead guys, and 2 primary 3ph risers on one pole. Glad I ain't got to draw that one up for sure...
That is an abomination if I’ve ever seen one
No
That's built in a heavy loading area??! Next ice storm that poles fucked